Linwood and Jackson Intersection Outfall and Impervious Removal- 2021
9
1
1
1
442 Franklin Street Outfall Restoration 2020
Replacement of headwall and addition of riprap
9
1
1
1
Plumetree Run Phase 3 Section 4- 2020
Located between Marketplace Drive and W. MacPhail Rd, around 1900 linear feet of eroding stream banks were repaired and armored. Tributary channels were lined with rip rap to prevent sedimentation into the existing stream channel.
9
1
1
1
Plumtree Run Stream Restoration 2018
Located along S. Atwood Road, around 1500 linear feet of eroding stream banks were repaired and armored. Riffles were installed to promote oxygenation of water and micropools were installed to help regulate temperature.
9
1
1
1
Rockfield Rain Garden 2018
9
1
1
1
706 Linwood Avenue Outfall Restoration 2019
Replacement of headwall and addition of riprap
9
1
1
1
422 Linwood Avenue 2018
Replacement of headwall and addition of riprap
9
1
1
1
331 Baltimore Pike- 2017
constructed headwall and reconnected separated pipes
9
1
1
1
3 Linwood Court 2015
Repaired separated pipe and added rip rap armored bank