Recent Projects

Linwood Outfall Repair- 2022

Picture1
Picture2

Linwood and Jackson Intersection Outfall and Impervious Removal- 2021

IMG_4749[1]
IMG_4748[1]

442 Franklin Street Outfall Restoration 2020

Replacement of headwall and addition of riprap
IMG_3557
IMG_3573

Plumetree Run Phase 3 Section 4- 2020

Located between Marketplace Drive and W. MacPhail Rd, around 1900 linear feet of eroding stream banks were repaired and armored. Tributary channels were lined with rip rap to prevent sedimentation into the existing stream channel. 

IMG_2813
IMG_2812
IMG_2971
9-3-20

Plumtree Run Stream Restoration 2018

Located along S. Atwood Road, around 1500 linear feet of eroding stream banks were repaired and armored. Riffles were installed to promote oxygenation of water and micropools were installed to help regulate temperature.
Stream rest 3
stream rest
stream rest 4
Stream rest 2

Rockfield Rain Garden 2018

Rockfield Rain Garden

706 Linwood Avenue Outfall Restoration 2019

Replacement of headwall and addition of riprap

IMG_2909
IMG_2944

422 Linwood Avenue 2018

Replacement of headwall and addition of riprap

SWO-19-002
IMG_0425

331 Baltimore Pike- 2017

constructed headwall and reconnected separated pipes
IMG_1452
IMG_1534

3 Linwood Court 2015

Repaired separated pipe and added rip rap armored bank
IMG_0472
IMG_0573